Autumn has started with a rush

Sorry i haven’t posted anything for a few days but i have been raced off my feet, On Wednesday Craig and myself were at a job in Wilbarston for most of the day, the customer liked my Showroom flooring so much she has had the same Carpet Tiles and  Matting installed in her Kitchen, Entrance, Utility and W.C, it looks fab.

Thursday started at a job in Market Harborough, I uplifted some old D.I.Y Self Adhesive Tiles in a En Suite, Chris from A&C Carpentry fixed a squeeky floorboard for the lady then I installed some Flotex, the En Suite was above a open porch on the front of the house and the Builder hadn’t insulated the void between the Porch ceiling and the En Suite floor making this area very cold in the Winter so while Chris was there he resolved this problem by filling the void with insulation resulting in one very happy customer. Then i installed a Wood effect Cushion Floor into a Bedroom at a house in Little Bowden which again looked great.

On Friday I installed some Hugh Mackay Castle Twist in a Bedroom and Hall, Stairs and Landing in Whetstone, I never seem to spend any time in the Showroom in the week now, Matt also informed me that we have now won the contract for the Entrance, Restaurant, Bar and Reception in a multinational Hotel chain that we have been installing the Bedroom Carpets for.

Saturday was manic in the Showroom, there was a constant flow of customers all day long,   my Little Bowden customer from Thursday came in to book a Penthouse Carpet for their Three Storey Stairs and Landing and some Moduleo Tiles for their Lounge and Hallway, its nice that we are getting a lot of repeat business now.

Sunday, so here we are at the end of another week its 1.30 and this is the first time i have had a chance to post anything since Monday, next week is even more hectic, also i am attending my Great,Great Uncles funeral on Friday  he was a Great Great Man so its only right that we give him a Great send off. So if i don’t get the chance to catch up with you till next weekend, have a nice week.

 

Another very busy day

Craig and I started the day Installing a Fells Saxony Carpet onto a Three Level Hall, Stairs and Landing in Slawston then we install 160 m2 of Gel Backed Commercial Carpet into a local Business. Matt and Dave install Moduleo Atlas Slate into a Kitchen on Kettering, all jobs looked great and all customers were very happy, photos to follow.

 

New Dance Floor

Harborough Academy of Performing Arts has a new floor in their Ground Floor Studio, Matt, Dave and Myself started the job yesterday installing 6mm Ply throughout and Feather finishing the joints then today we installed the Vinyl and Welded the joints using the new robot welder, what a great bit of kit, then we screeded a Kitchen Floor ready to install some Moduleo Flooring tomorrow.

 

Root Canal

Wednesday started with a trip to the dentist who informed me that i need Root Canal work on one of my Teeth, Great ill look forward too that, then I travelled to Kettering to Plyboard and install a Cushion floor into a Bathroom. In the afternoon Craig and I installed a Causeway Carpet into a large Through Lounge, it looked great.

Thursday was a busy day in the Showroom catching up with paperwork and banking plus a good steady flow of customers.

On Friday I Installed a nice Wool Twist pile into a large Lounge, the finished product looked fantastic, I was following two companies into this property that i work very closely with, Harborough Stone had installed the Fireplace and Log Burner and Sam Begley had Decorated the room, by using three local companies this customer had achieved a superior look to their Lounge. If you are looking to refurbish your property check these guys out.

Eco house

Craig and myself installed some MrTomkinson Classic Berber 100% Wool Carpet on recycled underlay into the Eco house in Market Harborough today, the project has been run by Sustainable Harborough, the finished job looks fantastic, it was also great to meet one of my old school pals who was doing some ground works at the project, I hadn’t seen him in fifteen years, what a great day, if finished off today installing Avenue Cushionfloor into two en suites in Foxton.

Job done on time

We installed some clarendon Henley carpet today in a bungalow in Fleetwood Gardens for a lovely couple, they picked up the keys for the property three weeks ago and all the tradesmen have been working flat out to turn this around quickly for them, i must admit things were a bit hectic when we first got there but everyone work together to get it finished, the whole place looks fantastic.

Summers back

I started at Lubenham Hill this morning installing some Whitestone Weavers City Twist Carpet into a Sitting Room, then I moved on to Fleetwood Gardens to Install some Fells High Society into a Bedroom, both carpets looked fantastic and both customers were very happy, looks like summer is here to stay I hope it lasts till the weekend for the Lubenham Scarecrow Festival.